SaaS MVP development cost usually lands between $15,000 and $50,000 in the US and £10,000 to £30,000 in the UK, by agencies' own published ranges. Where you land depends on four things: how many user types you launch with, billing, integrations, and whether you need multi-tenancy on day one. Each one adds weeks, and weeks are the bill.
Below: what three SaaS MVPs we shipped included, what each waited to build in phase 2, and what every common feature adds, in dollars and pounds.
💡 What you'll get from this post: a feature-by-feature way to price your MVP, and a list of what to leave out so you launch sooner.
TL;DR
- Typical range: $15,000–$50,000 in the US, £10,000–£30,000 in the UK for a first SaaS release.
- Our three MVPs: 8, 10 and 12 weeks. Two of them left big features (white-label, AI recommendations) for phase 2.
- Biggest add-ons: multi-tenancy, complex billing, each outside integration, native mobile apps and compliance work.
- Rate matters as much as scope: the same 960 hours costs very different amounts in the US, UK and India.
- Discovery: UK agencies charge £3,000–£4,950 for it. Ask whether yours is included.
How much does SaaS MVP development cost?
An MVP (minimum viable product) is the smallest version paying users can actually use. Published ranges for one cluster around $15,000–$50,000 in the US and £10,000–£30,000 in the UK. Every figure below comes from agencies that sell this work, so treat them as benchmarks, not prices.
| Source | What they price | Range | Time |
|---|---|---|---|
| Webridge (US) | SaaS MVP, 2–3 developers | $20,000–$50,000 | 6–10 weeks |
| TechConcepts (US) | Clickable prototype, no login | $8,000–$15,000 | 3–4 weeks |
| TechConcepts (US) | Single-user MVP | $15,000–$35,000 | 6–10 weeks |
| TechConcepts (US) | Multi-tenant SaaS | $40,000–$90,000 | 3–5 months |
| TechConcepts (US) | Enterprise-ready (SSO, audit logs, compliance) | $100,000–$500,000 | 6–18 months |
| Softomate (UK) | Standard SaaS MVP | £15,000–£30,000 | 8–12 weeks |
| Magora (UK) | Startup MVP, 1–2 core journeys | £10,000–£25,000 | 6–8 weeks |
Why are the ranges so wide?
They mix scopes and team locations. A single-user tool and a multi-tenant platform are both called "an MVP", and a London team and an offshore team are both called "an agency". Price your own feature list instead, which is what the rest of this post does.
What did 3 SaaS MVPs we shipped include, and what waited for phase 2?
These are three SaaS products we built, each written up as a public case study. Each launched with a 3-person team and a fixed scope. The useful part for budgeting is what didn't make the first release.
Field service job management SaaS: 8 weeks
A dispatch board, engineer scheduling, a mobile web app for engineers with digital job sheets, quotes, invoices with Stripe payment links, a customer portal and SMS alerts. The mobile side shipped as a web app engineers open on their phones, not separate iOS and Android apps. Read the field service case study.
Property rental management SaaS: 10 weeks
Landlord and tenant portals on one backend, automated rent collection through Stripe, maintenance tickets, e-signed leases, a compliance calendar and migration of 24 properties. White-label and multi-tenancy, so the client could resell it to other property firms, were left for phase 2. Read the property rental case study.
White-label corporate LMS: 12 weeks
A learning platform each client runs under its own brand and domain, with a course player, reporting, certificates and Stripe billing. White-label was the product here, so it couldn't wait: custom domains took weeks 9–10. AI course recommendations were left for the next phase. Read the white-label LMS case study.
What does each MVP feature add to the cost?
Here's each common feature with the weeks it took in our case-study week plans, next to what US and UK agencies publish for it. The weeks are ours; the prices are theirs, linked in the table.
| Feature | Weeks in our MVPs | Published US price | Published UK price |
|---|---|---|---|
| Discovery and data model | 1–2 | $5,000–$15,000 (TechConcepts) | From £3,000 (Magora) |
| Core workflow (job board, course player) | 3 | The bulk of any MVP quote | The bulk of any MVP quote |
| Sign-in options (social login, MFA, magic links) | Not counted separately | +$10,000–$20,000 combined; enterprise SSO adds 2–3 weeks (TechConcepts) | not published |
| Payments (Stripe) | About 1 | Included in a $20,000–$50,000 MVP (Webridge) | Payment gateway £3,000–£8,000 (Rockingtech) |
| Complex billing (usage-based, metered) | Not in any of the 3 | +$5,000–$15,000 (Webridge) | not published |
| File uploads | Part of core sprints | $5,000–$8,000; processing files adds $8,000–$15,000 (TechConcepts) | not published |
| Multi-tenancy | Designed in weeks 1–2 (LMS) | +$10,000–$25,000 (Webridge) | not published |
| Each outside integration | Spread across sprints | +$3,000–$8,000 (Webridge); $3,000–$15,000 (TechConcepts) | CRM £2,000–£6,000 (Rockingtech) |
| Mobile | 2 (mobile web app) | not published | Native iOS + Android MVP £20,000–£45,000 (Softomate) |
| White-label custom domains | 2 (LMS) | not published | not published |
| AI features | Left for phase 2 | +$10,000–$30,000 (Webridge) | not published |
| Compliance (SOC 2 or similar) | Not in any of the 3 | +$15,000–$40,000, plus $20,000–$50,000 for the audit (Webridge) | £5,000–£10,000 (Rockingtech) |
What is multi-tenancy, and do you need it on day one?
Multi-tenancy means one codebase serves many customer companies, with each company's data kept apart. You need it at launch if you sell to businesses that each get their own account. If your first customer is one company, it can usually wait, as it did on our property platform.
Which features cost least to postpone?
- AI features: launch the workflow first, then add recommendations once you have data to recommend from.
- White-label: unless reselling is the product, one brand is enough to start.
- Native mobile apps: a mobile web app covered field engineers in 2 weeks.
- Extra pricing plans: one plan in Stripe, more after you see who pays.
- Integrations nobody asked for yet: add the CRM sync when a customer needs it.
What does the same SaaS MVP cost in the US, UK and India?
Take an 8-week MVP with a 3-person team: about 960 hours. Multiply by published rates and the same scope gives very different bills. These use senior rates for every hour, so they overstate a mixed team; the point is the gap, not the exact total.
| Where the team is | Published rate | 960 hours at that rate |
|---|---|---|
| US, senior full-stack | $100–$150 an hour (Index.dev) | $96,000–$144,000 |
| UK, senior contractor | £575 a day median (Rockingtech, citing ITJobsWatch) | About £69,000 |
| Eastern Europe, senior | $58–$85 an hour (Index.dev) | $55,680–$81,600 |
| India, senior | $34–$52 an hour (Index.dev) | $32,640–$49,920 |
That's why a US senior-rate total sits far above the $15,000–$50,000 agency ranges at the top of this post: those ranges assume offshore or blended teams, fewer senior hours, or a smaller scope. Blended team rates, where juniors and seniors share the work, sit below these medians. Ours is $15–$25 an hour per team member. The fair questions for any offshore team are about overlap and process: do they cover your working hours, demo every two weeks and write decisions down?
Have a feature list? Send it over and we'll turn it into weeks, a team and a fixed quote. Get a SaaS MVP estimate →
Should you pay for a discovery sprint first?
A discovery sprint is a short paid phase where a team maps your workflow, designs the data model and turns your idea into a fixed scope. UK agencies publish prices for it: Magora from £3,000 (Magora), Rockingtech £4,950 plus VAT (Rockingtech). US guides put it at $5,000–$15,000 (TechConcepts).
The work itself is worth doing. On our property platform, two of the ten weeks went on discovery and the data model, because landlords and tenants share every record. Whether you should pay separately for it is another question. Our discovery is free: we scope the MVP and give you a fixed quote before you commit.
What should discovery give you?
- A written feature list, split into "launch" and "phase 2".
- Every user type and what each can see.
- A week-by-week plan.
- A fixed price for the launch scope.
What happens after launch: from MVP to version 1?
The MVP is the first bill, not the last. In all three of our case studies, the phase 2 work came from what users asked for after launch.
- Property platform: white-label and multi-tenancy, so the client can sell the platform to other property firms. Phase 2 is under way.
- White-label LMS: SSO (single sign-on with a company's own logins) for enterprise clients, then AI course recommendations.
- Field service SaaS: the client added four engineers within six months, and the app grew with them.
What does a SaaS MVP cost to run each month?
Budget for running costs from the start. These are published figures, before any new features:
| Cost | Published monthly range |
|---|---|
| Hosting, single-user MVP | $200–$500 (TechConcepts) |
| Hosting, multi-tenant under real load | $500–$2,000 (TechConcepts) |
| Sign-in service (Auth0, Clerk, Supabase Auth) | $0–$50 (TechConcepts) |
| Maintenance at Eastern European rates | $1,000–$2,400 (TechConcepts) |
| UK maintenance retainer | From £1,000 (Magora) |
For the full-product view, including yearly maintenance, see our SaaS app development cost guide.
How do you read a SaaS MVP quote?
Put two quotes side by side and check each one lists these. A quote missing three or more hasn't been thought through. If your requirements are still moving, TechConcepts advises adding 30–50% to any estimate you receive (TechConcepts), which is the best argument for a written feature list.
- The 3–5 jobs a user can do at launch.
- Every user type and their permissions.
- How billing works: plans, trials, per-seat or usage.
- Each outside service it connects to.
- Any data migration from spreadsheets or an old system.
- Web only, mobile web, or native apps.
- A week-by-week plan with demos.
- What happens after launch: bug fixes, support, hosting.
- Who owns the code and the hosting accounts.
What are the red flags in an MVP quote?
- One number, no breakdown. You can't see what to cut.
- No phase 2 list. Everything is "in", so scope will slip.
- No demos until the end. You find problems in week 10, not week 2.
- The team keeps the code. Moving teams later means a rebuild.
When shouldn't you build a SaaS MVP yet?
When you haven't spoken to ten people who'd pay for it, a build isn't the next step. A clickable prototype costs a fraction of a build and tells you whether anyone wants it. Rockingtech notes that UK budgets under £10,000 usually buy a demonstration rather than something paying users can rely on (Rockingtech).
And when an existing tool already does 80% of the job, a subscription is cheaper than any build. We wrote about where custom SaaS starts to pay off for smaller businesses. If you're ready to build, our guide to going from idea to MVP in 6 weeks covers the build itself.
Get a fixed quote for your SaaS MVP
Send us your feature list. We'll split it into launch and phase 2, then reply with the weeks, the team and a fixed price, with discovery included. No pitch, just a conversation.
Frequently asked questions
How much does a SaaS MVP cost?
Most published ranges put a SaaS MVP at $15,000–$50,000 in the US and £10,000–£30,000 in the UK. A single-user tool sits at the low end; multi-tenant SaaS, where many customer companies share one system with their data kept apart, runs higher, around $40,000–$90,000 by one US guide (TechConcepts). Billing, integrations, mobile apps and compliance are what push the number up.
Can I build a SaaS MVP for $10,000?
Sometimes, with a very small scope and a lower-rate team. UK agency Rockingtech says budgets under £10,000 usually buy a demonstration, and TechConcepts puts a clickable prototype at $8,000–$15,000 and a working single-user MVP at $15,000 or more. At $10,000, launch one user type, one workflow and one payment plan, use a mobile web app, and leave every integration for later.
How long does it take to build a SaaS MVP?
Usually 6–12 weeks from a clear scope. Our field service SaaS took 8 weeks, a property rental platform with landlord and tenant portals took 10, and a white-label learning platform took 12. Discovery and the data model took 1–2 weeks of each. Extra user types, multi-tenancy and data migration add the most time.
Should an MVP be fixed price or hourly?
Fixed price suits an MVP with a written feature list: you know the number, and changes go through a change request. Hourly (time and materials) suits work where the scope will keep moving. A common path is fixed price for the MVP, then a monthly team or hourly work for phase 2, once real users start asking for features.
Is it cheaper to do SaaS MVP development in-house?
For a first release, rarely. The median US software developer earns $135,980 a year (US Bureau of Labor Statistics) before benefits and hiring costs, so three in-house developers cost far more than an 8–12 week outside build. In-house starts to pay off once the product is your business and the roadmap runs for years.
Should I use no-code for my SaaS MVP?
For testing whether anyone wants it, often yes: a no-code version costs little more than a monthly subscription. It gets harder once you need several customer companies with separate data, custom billing or integrations the platform doesn't support. Many founders validate with no-code, then rebuild in custom code once they have paying users and clear requirements.
How much does an MVP cost in the UK?
UK agencies publish £8,000–£15,000 for a simple web app MVP and £15,000–£30,000 for a standard SaaS MVP (Softomate), with most startup MVPs at £10,000–£25,000 (Magora). The median UK senior contractor charges £575 a day (Rockingtech), so London teams sit at the top of those ranges. Check whether a UK quote includes VAT, charged at 20% (GOV.UK).
